Frequently asked questions.
Clear answers before, during and after the inspection.
Can’t find your question? Please contact us directly.
How long does an inspection usually take?
An apartment inspection usually takes about two hours. For a house, allow around three hours on average. Older homes often take longer because they typically contain more different materials and alterations.
Are samples always required?
No. However, some suspect materials can only be ruled out as asbestos-free through a valid laboratory analysis. The OVAM inspection protocol requires sampling for certain materials. If another suspect material is not sampled, it may be recorded as asbestos-containing in the certificate.
Do I need to be present during the inspection?
Not necessarily. The inspector must have access to all relevant rooms, outbuildings and parts of the property. Please arrange access in advance.
Is the inspection destructive?
A standard inspection is non-destructive. Walls and floors are not opened to look for enclosed materials. Small local marks needed to take a sample safely are not considered destructive inspection.
How should I prepare for the visit?
Make sure all rooms are safely accessible, unlock closed rooms and cupboards, clear obstructing storage and gather any available plans, invoices, technical sheets and previous laboratory analyses.
What if I refuse a sample?
For materials that must be sampled under the inspection protocol, refusal is incompatible with a standard compliant inspection. Other suspect materials may have to be recorded as asbestos-containing when the absence of asbestos cannot be demonstrated by laboratory analysis.
When will I receive the asbestos certificate?
The certificate is normally issued within a few working days after the site visit. The exact timing depends partly on how quickly the laboratory analyses any samples.
Is an asbestos certificate the same as a destructive survey?
No. A standard asbestos certificate describes visible and accessible materials under normal use. Additional destructive investigation may be required before renovation or demolition work.
Do outbuildings also need to be inspected?
Accessible outbuildings and other structures may be part of the inspection area. Include all structures on the plot in your request, such as a garage, garden shed, storage room or workshop.
Will a certificate be required for a new tenancy from 2030?
From 1 January 2030, an asbestos certificate will be required before entering into a new tenancy agreement for a home built before 2001 in Flanders that will be the tenant’s main residence. The landlord must provide the certificate before the agreement is concluded. This measure is included in the decree adopted by the Flemish Parliament on 10 November 2026. If a certificate is already available, it must already be provided to the tenant.
Does asbestos-safe mean asbestos-free?
No. An asbestos-safe building may still contain asbestos materials. The conclusion concerns risks during normal use and the condition of the inspected materials. Hidden materials may fall outside a non-destructive inspection.
What if I do not have building plans?
You can apply without building plans. Tell us beforehand so we can establish which drawings are needed. Any charge for preparing drawings is specified in the quotation in advance.
Which documents will I receive?
You receive the official certificate, the signed assignment form and the laboratory results where samples were analysed. Where applicable, we also provide the refusal document. We explain the main findings.
Is a structure smaller than 20 m² always exempt?
No. Accessible structures built before 2001 can also be covered if the combined relevant footprint is at least 20 m² or if the structure is part of a larger building complex. This statutory footprint differs from the usable floor area used for our prices.
Must an existing common-parts certificate be shared before 2027?
Yes. If already available, it must be disclosed to the prospective buyer when a private unit is transferred, even before 1 January 2027.
What if one owner owns the entire apartment building?
Dividing a building into separate inspection areas may create commonly used parts even without a co-owners’ association. In that situation, a separate certificate has been required on transfer since 1 May 2025. We discuss the scope with you in advance.
When is payment due?
You have 14 calendar days from the invoice date to pay. If unpaid, a free first reminder is followed by the statutory waiting period of at least 14 calendar days. Only after that period may the interest and fixed compensation set out in our terms be charged.
Usable floor area
Our prices use the combined usable floor area of all storeys, including an ordinary cellar and attic. Gardens and crawl spaces do not count. List garages and outbuildings separately so we can define your quotation correctly. This pricing calculation does not determine which areas must be inspected under the inspection protocol.
